The original St. Paul Church of Edgewood, was dedicated on October 27, 1907, and was a fairer looking rendition of what is now “Monsignor Canning Hall”, currently the utility
building for parish affairs. Around the time of dedication a census recorded 770 people in the parish. Almost twenty-
one years later, on October 21, 1928, the cornerstone for the new Church was laid under supervision of architecture
firm Ambrose Murphy; Samuel Morino, a convert from Judaism, its principle architect. The new church was dedicated
on November 16, 1930.
The modified Gothic church suffered from a deterioration of the interior. As with most water penetration cases, the
water entered through the perimeter shell. L | L + B was hired to perform a Restoration Survey. Based upon site observations, probing, and discussions among members of the survey team, reports and estimate information was generated to form the basis for this exterior shell building survey.
As the survey progressed, exterior concerns such as the discovery of temporary cable-trussed tower buttress
capstones and mortar dislodging from buttresses and falling on entry walks, reinforced the urgent need for exterior
shell analysis and repairs. L | L + B guided these repairs, and St. Paul Church of Edgewood once again stands out as a
community icon.
A multi – disciplinary, award – winning architecture firm, Lerner | Ladds + Bartels has left its imprint on the landscape for over 70 years. Our strength is the diversity of work, including institutional, historic restoration, adaptive reuse, commercial and residential projects. While the firm continues to grow and evolve, a commitment to thoughtful design remains at our core.
